NubeLogo

Virtual Machines

Global Nodes

🇭🇰Hong KongđŸ‡¯đŸ‡ĩJapan🇸đŸ‡ŦSingapore🇹🇭ThailandđŸ‡ē🇸United States🇩đŸ‡ĒGermany

Featured InstancesHOT

🇹🇭Thailand Native IP🇭🇰HK Residential Broadband

Bare Metal Servers

Dedicated Configurations

🇭🇰Hong KongđŸ‡¯đŸ‡ĩJapan🇸đŸ‡ŦSingapore🇹🇭ThailandđŸ‡ē🇸United States🇩đŸ‡ĒGermany

Add-ons & Network

Managed Services

Tier 3+ Rack ColocationGlobal Server Colocation

Network & IP

IPv4 Address Leasing
Cloud Services
AI ServicesSupport
EnglishįŽ€äŊ“中文
English

Virtual Machines

Global Nodes

🇭🇰Hong KongđŸ‡¯đŸ‡ĩJapan🇸đŸ‡ŦSingapore🇹🇭ThailandđŸ‡ē🇸United States🇩đŸ‡ĒGermany

Featured InstancesHOT

🇹🇭Thailand Native IP🇭🇰HK Residential Broadband

Bare Metal Servers

Dedicated Configurations

🇭🇰Hong KongđŸ‡¯đŸ‡ĩJapan🇸đŸ‡ŦSingapore🇹🇭ThailandđŸ‡ē🇸United States🇩đŸ‡ĒGermany

Add-ons & Network

Managed Services

Tier 3+ Rack ColocationGlobal Server Colocation

Network & IP

IPv4 Address Leasing
AI Services
Support
English
EnglishįŽ€äŊ“中文

Nube Cloud ¡ Server sourcing & colocation

Global server colocation
From planning to production.
We handle every step.

We source, assemble and test in mainland China, then handle cross-border shipping, customs, rack installation and connectivity.

Talk to an expert ↗Rent or buy?
Three rack servers on pale blue display platforms
7locations

Global locations

Across Asia, Europe and North America

5–7days

Intensive burn-in testing

Component tests and sustained system stress tests

3months

Full hardware fault coverage

Replacement parts and repair labor covered

Rent or buy?

Choose rental or ownership based on your hardware needs, launch date and expected usage period. We will plan delivery around that choice.

Rent a server

Start without an upfront hardware purchase

Fast deploymentFlexible terms
  • Standard hardware and a fast launch
  • An uncertain usage period
  • Proofs of concept, testing or short-term workloads
Explore server rental ↗

Buy and colocate

Own hardware selected for your workload

Custom configurationsBetter long-term value
Specialized hardware
High-capacity RAMMany-core CPUsGPUHigh-capacity storageBlade servers or specialist networking
Long-term use

Running for 24 months or more

Discuss a hardware build ↗

Already own your hardware?

We can take over shipping, rack installation, connectivity and on-site support.

Contact us

From planning to production.
We handle every step.

When sourcing, assembly, testing, shipping, customs and colocation are split across teams, small mistakes can add rework, cost and weeks of delay. Nube Cloud manages all nine stages.

01–03/

Planning and budget

01

Review requirements

Confirm workloads, hardware needs and launch dates

Common mistakes
Wrong capacity estimatePower overlooked
02

Plan the budget

Budget for hardware, shipping, power and colocation

Common mistakes
Power costs omittedTaxes omitted
03

Confirm the build

Check compatibility, rack dimensions and power connections

Common mistakes
Wrong power cablesMismatched connectors
04–06/

Procurement, assembly and testing

04

Source components

Check models, condition, serial numbers and accessories

Common mistakes
Single PSU orderedWrong configuration
05

Assemble hardware

Install components, secure heatsinks and route cables

Common mistakes
Incorrect slotIncompatible heatsink
06

Quality validation

Test components, then stress-test the system for 5–7 days

Common mistakes
Boot-only testingError logs missed
07–09/

Shipping, customs and deployment

07

Ship and clear customs

Pack securely, insure the shipment and prepare customs documents

Common mistakes
Inadequate packagingMissing declarations
08

Rack and connect

Install rails, connect power and verify network access

Common mistakes
Rails do not fitWrong port cabling
09

Hand over the system

Hand over access credentials, asset lists and test reports

Common mistakes
Missing access rightsIncomplete asset records

Deployment delays: case studies

Delayed
2months

Half-rack deployment in Johor Bahru

Testing / shipping

The NIC was not tested with the final transceivers and cables, and the hardware was damaged in transit. A late-December launch slipped to late February.

Delayed
6months

Hong Kong colocation for a European VPS provider

Sourcing / compatibility

The first server needed repair; the second had an incompatible CPU and motherboard. Work began at year-end, but the servers did not go live until mid-June.

Sourced and assembled in mainland China

Cost-effective components.
Built into powerful, reliable servers.

We source through Taobao, Xianyu and mainland Chinese suppliers of used and refurbished enterprise hardware. We compare models, condition and pricing, manage suppliers, check compatibility, assemble and test, and arrange secure packing and international shipping.

Dell PowerEdge R640 product image
Dell PowerEdge R640

Virtualization hosts

1 TB-class RAM ¡ Many-core CPUs

Run large VM fleets with high compute density and performance per watt.

Tyan S8036 product image
Tyan S8036

High-capacity storage

Multiple drive bays ¡ Dense storage

Built for object storage, large datasets and high-capacity disk arrays.

NVIDIAÂŽ HGXâ„ĸ B200 product image
NVIDIAÂŽ HGXâ„ĸ B200

GPU compute nodes

GPU compute ¡ High-power cooling

For AI inference, image and video generation, and video transcoding.

Nexus 9336C-FX2 product image
Nexus 9336C-FX2

Network appliances

Multiple ports ¡ High throughput

For software firewalls, virtual switching, traffic scrubbing and routing.

Rigorous quality validation

Before shipping, we record each device, inspect its condition, verify firmware, test components and run sustained combined workloads. Both the test engineer and reviewer sign off.

Hardware test report

Sample report

Traceable records, from component checks to full-system stress tests.

Tests passed
All 8 checks completed

Device records

Device ID
SRV-DEMO-001
Test period
From2026-09-12 09:00
To2026-09-18 09:00
Stress testing
5–7days
Sustained combined-load testing
Firmware records
BIOS version2.21.2
BMC version7.00.00.171
Drive firmwareGDC5602Q
Visual inspection
Asset records
System serial7KX3D92
Board serialCN0H28RR09215
RAM / storage512 GB / 7.68 TB
GPU / powerT4 16 GB / 2 × 750 W

Test results

8 / 8 checks passed
Sample test records
Full test passes4 / 4 passes
Bad sectors / anomalies0
Settings & slotsVerified
Sample test records
Load testingCompleted
Temperature & frequencyRecorded
Error logsNo issues found
Sample test records
Capacity checkCompleted
Drive self-testPassed
Bad sectors / anomalies0
Sample test records
Bidirectional testCompleted
Cables & transceiversPassed
Port speed10G
Sample test records
Cold starts5 / 5 starts
Power failoverPassed
Power recoveryPassed
Sample test records
Compute & GPU memoryCompleted
Interconnect checkPassed
Power & temperatureRecorded
Sample test records
Fans & airflowVerified
Temperature logRecorded
Unexpected throttlingNone found
Sample test records
Test duration144 hours
Combined loadCompleted
Unexpected stops0
Test engineerNick
Review engineerBen
Quality verified ¡ Review passed
90days

Support after deployment

A 90-day hardware warranty after deployment, covering replacement parts and repair labor.

Cost breakdown

Hardware, deployment and recurring charges, clearly itemized.

Procurement & setup

One-time cost
HardwareServers and key components
AccessoriesRails, power cords and network cables
Packing & shippingCrates, protective frames, freight and insurance
DeploymentSourcing, assembly, testing and rack coordination
Management & service feeProcurement cost × 15%

Additional costs

Customs duties, import taxes and storage caused by customs delays are charged at actual cost.

Ongoing colocation

Recurring cost
Rack spaceRack units, half racks or full racks
PowerPower allocation; single or dual feeds
Bandwidth / trafficDIA or BGP; shared or dedicated
IP & routingIPv4 / IPv6, your own IPs and ASN
On-site supportOut-of-band access, remote hands and parts replacement
Minimum term12 months

Hardware purchase financing

We can advance up to 50% of the hardware purchase cost

Discuss financing

Your down payment

Lower upfront cash requirements

~50%

Pay the balance in installments

Spread the remaining cost over time

12–24months

Global network. Worldwide deployment.

Our own IP / MPLS backbone connects locations across Asia and North America.

Internet & BGP

DIA and BGP connectivity, billed by bandwidth or traffic, with DDoS protection available.

IP & routing

IPv4 and IPv6, announcements for your own IP space, and BGP with your own ASN.

Out-of-band access

Check hardware, control power, access the console and mount OS images remotely.

Remote hands

On-site cabling, component replacement, troubleshooting, removal and packing.

Frequently asked questions

Answers on delivery times, acceptance testing and ongoing support.

Services and options

01

Is application management included?

No. We handle hardware, networking and colocation. You manage the operating system and applications.

02

When should I buy hardware?

Consider buying and colocating when you need specialized hardware or expect to run it for 24 months or longer.

03

Can you colocate my existing hardware?

Yes. We handle cross-border shipping, rack installation, network connectivity and on-site support.

Procurement and costs

04

What does the 15% service fee cover?

Requirements and planning, sourcing, assembly, testing, shipping and customs coordination, rack installation, handover and a 90-day hardware warranty after deployment.

05

Do you only source new hardware?

No. Choose new, used, refurbished or mixed builds. We list the condition of each key component.

06

How are taxes and extra storage billed?

They are charged at actual cost and excluded from the base used to calculate the 15% service fee.

Delivery and warranty

07

How long does burn-in testing take?

We run combined stress tests for 5–7 days and deliver only after every test passes.

08

What if hardware is damaged in transit?

We use reinforced packaging and shipping insurance. If damage occurs, we contact the carrier, investigate and coordinate the insurance claim.

09

Can I retrieve my hardware?

Yes. Once outstanding charges and colocation fees are settled, we remove and pack the equipment and coordinate collection.

Tell us about your server needs

Share your workload, expected usage period, target location, budget and any specialized hardware needs.

Talk to an expert ↗Explore server rental
Nube Cloud is committed to providing premium cloud services at reasonable prices for internet users worldwide.Š 2023-2026 Nube Cloud
Contact Us[email protected]
Site MapCloud ServicesConsoleTerms of ServicePrivacy PolicyAcceptable Use Policy